Search: Home | Atlas | Guides | Tests | Research | Techs | Skills | Index | Recent Changes | Preferences | Login

Guilds > Kush Public Works > Mega

  1. HOME

Welcome to Kush Mega Project Association

ALL materials on site except chronozon which we are trading for... site is up, preloading in progress... prebuilds soon




Paint & Treated Boards : You dont have to make those items yourself
We offer you to just supply the resources needed to produce them
Someone familiar with the production will deliver the end product
However, if you have paint or treated Boards on hand or prefer making your share on your own, you are welcome to do so as well
Resource requiremtns have been added to the Member contributions pages



Basic Materials


(Note: Materials used in Central Structure do not vary, so some materials will show the same number for minimum and maximum)

Standard materials required

Each Megalopolis can vary from 25% of the standard to 300% of the standard for each material. In the table below, section types are listed in bold, with the materials required for a single section of that type listed below it. Totals by material are given on Megalopolis Planning Template

ITEM # TYPE # MAT TOTAL MAT
Ramp 4
Bricks 10000 40000
Cut Stone 1000 4000
Concrete 100 400
Pliable Hard 400 1600
Nails 563 2252
Tower 12
Concrete 36 432
Rigid Rotproof 900 10800
Nails 96 1152
Cut Stone 123 1476
Gold Wire 140 1680
jade:looking glass 1 12
Dark Golden Rod 1000 12000
Orange 1000 12000
Indigo 400 4800
Saddle Brown 250 3000
Forest Green 300 3600
Wall Segment 8
Concrete 300 2400
White Glossy Fireproof 400 3200
Nails 140 1120
Cut Stone 1000 8000
Feldspar 1600 12800
Indigo 700 5600
Orange 1000 8000
Forest Green 900 7200
Dark Golden Rod 300 2400
Bridge 4
Bricks 10000 40000
Concrete 36 144
Pliable Soft Rotproof 4000 16000
Nails 700 2800
Cut Stone 250 1000
Iron Bars 140 560
Gate 4
Bricks 8000 32000
Cut Stone 250 1000
Concrete 900 3600
Hard Rigid 4000 16000
Nails 700 2800
Hexas Plate 21 84
Choronzon 21 84
Thistle 21 84
Unity 1 4
F A M 1 4
Tomato 228 912
Forest Green 563 2252
Saddle Brown 165 660
Spring Green 123 492
Side Wall 8
Concrete 350 2800
Iron Bars 12 96
Silver Sheeting 4 32
Hard Glossy Rotproof 1890 15120
Nails 140 1120
Cut Stone 123 984
Forest Green 1350 10800
Dark Golden Rod 840 6720
Indigo 700 5600
Orange 140 1120
Edge Wall 8
Concrete 1000 8000
Iron Bars 12 96
Gold Bar 4 32
Hard Rotproof 1500 12000
Nails 300 2400
Cut Stone 140 1120
Forest Green 1600 12800
Dark Golden Rod 600 4800
Indigo 900 7200
Orange 300 2400

ITEM Grand Total ON HAND NEED
Basic Materials done
Bricks 112000 180650 -68650
Concrete 17776 35914 -18138
Cut Stone 17580 32099 -14519
Iron Bars 752 2080 -1328
Silver Sheeting 32 228 -196
Gold Bars 32 151 -119
Gold Wire 1680 4582 -2902
Nails 13644 21948 -8304
Treated Boards done
Hard Rigid 16000 16270 -270
Hard Rotproof 12000 20470 -8470
Hard Glossy Rotproof 15120 16700 -1580
Pliable Hard 1600 3566 -1966
Pliable Soft Rotproof 16000 16300 -200
Rigid Rotproof 10800 10846 -346
White Glossy Fireproof 3200 4263 -1063
Cut Gems
Choronzon 84 49 35
F A M 4 8 -4
Hexas Plate 84 97 -13
Thistle 84 84 0
Unity 4 14 -10
Looking Glass 12 42 -30
Paints
Indigo 23200 100 23100
Feldspar 12800 458 12342
Dark Golden rod 25920 0 25920
Orange 23520 0 23520
Saddle Brown 3660 832 2828
Forest Green 36652 0 36652
Spring Green 492 315 177
Tomato 912 186 726


NameCreatorDateSizeDescription
paint_resource_calculator-new.xlssinghDecember 8, 2007 3:05 pm44544updated calculator - fixed errors
paint_resource_calculator.xlssinghDecember 8, 2007 8:11 am44544Counting paint and treated boards resources for mega

Home | Atlas | Guides | Tests | Research | Techs | Skills | Index | Recent Changes | Preferences | Login
You must log in to edit pages. | View other revisions
Last edited January 8, 2008 5:21 am by singh (diff)
Search: